Improved efficiency in scrap steel and bulk material handling

About the customer

The Dillinger Group is providing maximum quality and best possible service in the field of heavy plate. This applies both to the work of our integrated iron-and-steel plant, to the production of coke and smelting of iron by Zentralkokerei Saar GmbH and ROGESA Roheisengesellschaft Saar mbH, two subsidiaries owned jointly with Saarstahl AG, and to the production of liquid steel and semi-fabricates.

Visit homepage >

The need

Transport of heavy scrap steel blocks, steel beams and all kinds of scrap steel pieces. The transportation system had to be reliable in order to minimize down time in the production process.

 

The solution

The Liftec Translifter decouples container on the cassette at different transfer points, keeping the capital investment always on the move. This effects reduced fuel costs, waiting times and the number of equipment needed.

By using the most advanced equipment and technology available, the port is able to offer world-class service delivering reliable and efficient operations 24 hours a day, seven days a week.

RELEVANT PRODUCTS

Your local project manager

Josef Konersmann is one of our very experienced and highly skilled Regional Sales Managers, who can support you with knowlegde about how to optimize your transport solution.

Josef Konersmann

Regional Sales Manager

Josef Konersmann

Josef.konersmann@ntliftec.com
+49 171 652 9099

CONTACT

Get in touch

Do you have any questions about our products or another subject? Then feel free to reach out to us using the contact form or email or call one of our engineers directly. We look forward to hearing from you.

+45 98 16 50 09

mail@novatech.dk

  • Want to learn more?

    * required
  • This field is for validation purposes and should be left unchanged.